85 South 1350 East 
Lehi, Utah 84043 
Local 801-768-3332
Free Call 800-947-0249
 

     Home >> Metal Roofing >> Roofing Accessories >> Boots >> Boot Installation 2

 

Boot Installation

SELECT and TRIM...
Choose appropriate Master
Flash with opening at least 20%
smaller than pipe diameter.
If necessary trim opening to
20% smaller than pipe diameter.

SLIDE...
Slide Master Flash down
over pipe. (A non-petroleum
base lubricant will ease
installation.)

FORM...
Press Master Flash down.
bending it to conform to roof
profile or roof irregularities.
A blunt tool will help press
flashing into tight roof angles.

SEAL...
Apply silicone sealant
between base and roof.

FASTEN...
Use fastener to complete
sealing. For UPC installation,
fastener spacing may not
exceed 1-1/2" (38mm).


Sold "as is"  *  Subject to prior sale  *  Prices quoted based on "Full Piece" purchase  *  Lengths vary  *  Minimum order required
Cash & Carry FOB Lehi, UT  *  Delivery available  *  Charges extra  *  Cutting to size available
Ask for cutting fees and price per piece  *  This advertisement must be presented at time of purchase
Prices can change without prior notice

85 South 1350 East Lehi, Utah
Call (800)947-0249
Local (801)768-3332
Fax (801)768-3349

M-F 8 to 5 Sat 8 to Noon

Home Contact Delivery Services Mailing List Industry News
Metal Roofing Steel Products B-Decking Store Products
© MetalMart 2006-2008