Home
Payment Authorization
Steel Products
Metal Roofing
B-Decking
Handyman Hardware


Delivery
Contact
Mailing List



Services

Links

       
   

     Home >> Metal Roofing >> Roofing Accessories >> Boots >> Boot Installation 2

 

Boot Installation

SELECT and TRIM...
Choose appropriate Master
Flash with opening at least 20%
smaller than pipe diameter.
If necessary trim opening to
20% smaller than pipe diameter.

SLIDE...
Slide Master Flash down
over pipe. (A non-petroleum
base lubricant will ease
installation.)

FORM...
Press Master Flash down.
bending it to conform to roof
profile or roof irregularities.
A blunt tool will help press
flashing into tight roof angles.

SEAL...
Apply silicone sealant
between base and roof.

FASTEN...
Use fastener to complete
sealing. For UPC installation,
fastener spacing may not
exceed 1-1/2" (38mm).



85 South 1350 East Lehi, Utah
Call (800)947-0249
Local (801)768-3332
Fax (801)768-3349

M-F 8 to 5

Saturdays 8 to Noon

Home Contact Delivery Services Mailing List Industry News
Email Signup Metal Roofing Steel Products B-Decking Store Products Payment Authorization
 
Mark Terry Dale Brad    
© MetalMart 2006-2010